1. admin

    0.0
    Your rating:

    I talked to Larry and we negotiated a price for him to travel to perform an inspection outside of his normal territory. 3 days prior to the inspection I received a contract with a DRASTIC difference in price as to what we had previously agreed upon. I called him immediately about it and was given completely different numbers and the rational as to why the price went from $500 to $765. I believe he underbid it the first time and/or decided he didn’t want to perform the inspection and tried to cover his tracks without the proper communication. I would hope this is an exception to his normal routine, however, I am very disappointed and was left in a very difficult situation.